City of Ft. Pierce
Gator Dredging performed the dredging of approximately 5000 cubic yards of sediment from the marina entrance channel and floating dock basin. We used a 8inch hydraulic dredge to remove the material from the floating dock basin. This material was pumped into geotubes on Tern Island. That material was used to restore the slopes of the pocket beaches on the island.